Audenreid Tunnel nodes

Title Content type Status Updated Sort ascending Operations
8 10 05 pouring concrete for limestone tank side wall Gallery Published
5 9 2005 cleared area for limestone tanks and settling ponds Gallery Published
8 16 05 installation of distribution chamber Gallery Published
5 12 2005 clearing and grubbing at limestone tanks and settling ponds location Gallery Published
8 24 05 installation of piping system from intake to limestone tanks Gallery Published
06 17 06 audenreid site dedication Gallery Published
8 24 05 preparing to pour side walls of concrete limestone tanks Gallery Published
07 05 06 clearing debris from distribution box after flood damage. Gallery Published
8 24 05 view of treatment system intake with rock filter and rock lined channel Gallery Published
07 05 06 view of collapsed mine opening and damaged intake system after the june 27 29 2006 flooding Gallery Published
07 21 05 view of intake system site preparation from above mine opening Gallery Published
7 18 05 rebar placement for concrete limestone tank base Gallery Published
7 18 2005 clearing of mine tunnel opening Gallery Published
Audenreid Tunnel Cross Section Gallery Published
audenried_treatment_tanks Gallery Published
100_0314 Gallery Published
Audenreid Flood Repair Design 2007 Downloads Published
Audenreid Design 2005 Downloads Published
O&M Plan-Final Downloads Published
Audenreid Tunnel / Analysis Report, Import 8 Analysis Report Published
Water Quality Report Downloads Published
Audenreid Financial Report Downloads Published
Audenreid Final Report 12-07 Downloads Published
Audenreid Tunnel Schematic Downloads Published
Audenreid Mine Tunnel Summary Downloads Published
Final Catawissa Creek Restoration Plan Downloads Published
Catawissa Creek Watershed Published
Catawissa Creek Watershed Published
Catawissa Creek Watershed Published
Catawissa Creek Watershed Published
Catawissa Creek Watershed Published
Catawissa Creek Watershed Published
10 10 3 Gallery Published
08 10 1 Gallery Published
04 03 1 Gallery Published
10 21 1 Gallery Published
10 21 2 Gallery Published
10 27 1 Gallery Published
11 09 1 Gallery Published
11 21 2 Gallery Published
CC-5DWN Sample Point Published
D1-250 System ID Published
PA-238 System ID Published
Title IV, Appalachian Clean Streams Initiative Funding Published
EPA Section 319 Funding Published
OSM Watershed Cooperative Assistance Funding Published