EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
EPCAMR |
Organizations |
Published |
|
|
Audenreid Tunnel Information Sheet |
Downloads |
Published |
|
|
Settling Pond |
Treatment Technologies |
Published |
|
|
Up Flow Limestone Bed |
Treatment Technologies |
Published |
|
|
9 27 05 view of intake system |
Gallery |
Published |
|
|
12 2 01 |
Gallery |
Published |
|
|
9 29 05 delivery and addition of limestone to tanks |
Gallery |
Published |
|
|
12 2 02 |
Gallery |
Published |
|
|
12 15 05 12 15 05 audenreid treatment system in operation |
Gallery |
Published |
|
|
10 10 05 intake distri chamber with guillotine values on piping to the three limestone tanks |
Gallery |
Published |
|
|
12 15 05 view of intake system above mine opening |
Gallery |
Published |
|
|
10 10 05 view of drawn down discharge pipe for the two settling ponds. |
Gallery |
Published |
|
|
100 1195 |
Gallery |
Published |
|
|
10 19 05 view of siphon installed piping network before placement of concrete chamber |
Gallery |
Published |
|
|
Aerial photograph of audenreid treatment system before construction |
Gallery |
Published |
|
|
Site of audenreid mine tunnel opening pre construction conditions 2 |
Gallery |
Published |
|
|
Site of audenreid mine tunnel opening pre construction conditions. |
Gallery |
Published |
|
|
Site preparation for limestone tanks |
Gallery |
Published |
|
|
View looking downstream of audenreid mine tunnel opening showing proper es controls. |
Gallery |
Published |
|
|
11 09 05 view of 2nd settling pond with berms that will be below water level when full |
Gallery |
Published |
|
|
View of audenreid treatment system showing the three limestone tanks and two settling ponds. |
Gallery |
Published |
|
|
11 14 05 view of first pond below limestone tanks with berms that will be below water level when full |
Gallery |
Published |
|
|
9 6 05 limestone addition to tanks |
Gallery |
Published |
|
|
9 14 05 stone bedding material additions to tanks bottoms |
Gallery |
Published |
|
|
11 21 05 intake concrete distribution chamber showing rip rap lined overflow channel |
Gallery |
Published |
|
|
9 21 01 |
Gallery |
Published |
|
|
11 21 05 view of 2nd pond seeded to stablize banks before filled with water |
Gallery |
Published |
|
|
9 27 02 |
Gallery |
Published |
|
|
12 02 05 intake system buried under rock filter |
Gallery |
Published |
|
|
7 18 2005 site excavation of treatment system intake location |
Gallery |
Published |
|
|
7 19 05 pouring concrete for base of limestone tanks2 |
Gallery |
Published |
|
|
7 19 05 preparing site for intake system construction |
Gallery |
Published |
|
|
7 22 05 preparing to pour side walls of concrete limestone tanks |
Gallery |
Published |
|
|
08 10 2 2 |
Gallery |
Published |
|
|
5 1 2005 clearing and grubbing at location of limestone tanks and settling ponds |
Gallery |
Published |
|
|
08 10 05 view of intake system showing rock filter and rip rap lined overflow channel |
Gallery |
Published |
|
|
5 8 2005 clearing grubbing and es control placement at mine opening and intake location |
Gallery |
Published |
|
|