Skip navigation
Project Details
  • Bear Run Phase VIII
    No
    Underground
    Passive Treatment System
    Susquehanna
    Bear Run

    Bear Run Phase VIII, completed in 2013, utilizes an up-flow, manual flush, oxic limestone drain system for treatment.

    2013
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
8.206.77.2----11.6534--120-990.14--0.13--0.54--1340
Treatment Technologies
Treatment Technology Quantity of Elements
Up Flow Limestone Bed 1