Sample Point Inflow Outflow Years Monitored Description Edit Delete
ER13A Yes No

AMD; Influent to the ER 13/14 passive system; A limestone channel collects and conveys the discharges to the Forebay (Equilization Basin) of the treatment system. It is uncertain if the influent is at the 36" pipes going into the Forebay or pipes coming out of Forebay.

ER13B No No

Effluent of Vertical Flow Pond B

ER13C No No

Effluent of Settling Basin C

ER13D No No

Effluent of Vertical Flow Pond D

ER13E No Yes

Effluent of Settling Basin E and Final Effluent of the ER13/14 passive system

ER3 No No

Emigh Run; Point 3; Sampled above ER13/14 treatment; Alder Run Engineering sample point

ER4 No No

Emigh Run; Point 4; Sampled Below ER13/14 treatment system; Alder Run Engineering point