Skip to main content

Emigh Run 13/14 (ER13/14)

Emigh Run 13/14 (ER13/14)

Project Details
Original Construction Year 2010
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Unknown
Latitude 40.946672
Longitude -78.264396
Elevation
Project Emigh Run 13/14 (ER13/14)
Project Type Passive Treatment System
Project Status
AMD Source Surface, Underground
Stream Emigh Run
Watershed
River Basin Susquehanna
Quad Wallaceton
City/Township Morris
County Clearfield
State PA

Description: A passive system was installed to treat the Emigh Run 13 and 14 AMD discharges. The discharges are collected and then conveyed to the location of the treatment system by a limestone channel that was built in 2007 in order to get the discharges to property where they were allowed to build a system. The PA DEP should be contacted for any issues related to the channel. Note: Another name for this system is Thompson 1 Strip.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Forebay 1 N/A
Open Limestone Channel (OLC) 1 N/A
Settling Pond 2 N/A
Vertical Flow Pond (VFP) 2 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization: PA DEP
Project Designer: Jennifer Demchak and Michelle Merrow
Project Designer Organization: Alder Run Engineering
Project Responsible Organization: PA DEP
Organizations
no data available
External System IDs
Title System
PA-133 OSM
Project Performance