Sample Points
Sample Point | Aliases | Photo | ID's | Inflow | Outflow | Years Monitored | Description | Audience | Edit | Delete |
---|---|---|---|---|---|---|---|---|---|---|
BP3 RAW | Yes | No | Abandoned Mine Discharge; emanates on hillside, collected by a grate and conveyed into a vertical flow pond type component. AKA 281-A1 |
Manage Audience | ||||||
BP3 VFW | No | No | effluent of vertical flow pond type component; receives BP3 RAW ; Flows into settling pond. AKA 281-B1. Updated to riser pipe with valve 2023. |
Manage Audience | ||||||
BP2 RAW | Yes | No | Abandoned Mine Discharge; emanates near park road and flows into a limestone pond. AKA 281-A2. Sample at pipe installed above AVFP in 2023. |
Manage Audience | ||||||
BP2 Siphon | No | No | Effluent of limestone pond; receives the BP2 discharge; flows into BP2/BP3 settling pond. AKA 281-B2. Sample possible if BP2 auto-flusher is actively flushing from limestone pond through siphon. |
Manage Audience | ||||||
BP4 RAW | Yes | No | Abandoned mine discharge; emanates from pipe near park road and flows into BP4 VFW #1. AKA 281-A3. |
Manage Audience | ||||||
BP4 VFW #1 | No | No | Effluent of vertical flow pond type component; Receives the 281-A3 discharge and flows into 281-C2 settling pond. AKA 281-B3. Updated to riser in 2023. |
Manage Audience | ||||||
BP4 Pond #1 | No | No | Effluent of first BP4 settling pond; receives influent from BP4 VFW #1; flows into BP4 VFW #2. AKA 281-C2 |
Manage Audience | ||||||
BP4 VFW#2 | N/A | No | No | Effluent of second BP4 VFW component; receives influent from BP4 Pond #1 and flows into settling pond BP4 Pond #2. AKA 281-D1. |
Manage Audience | |||||
BP4 Pond #2 | N/A | No | No | Effluent of BP4 settling pond #2; receives influent from BP4 VFW #2; Flows into final wetland. AKA 281-E1. |
Manage Audience | |||||
BP2/BP3 Pond | N/A | No | No | Effluent of settling pond which receives flow from BP2 and BP3 VFWs; Flows into the final wetland. AKA 281-C1. |
Manage Audience | |||||
RRO | N/A | Yes | No | Road Run Off, stormwater runoff above system. Flows into the final wetland, mixing with water from BP4, BP3, & BP2 systems. |
Manage Audience | |||||
SYS OUT | No | Yes | Final Effluent of Boyce Park passive treatment system; final wetland; receives flow from constructed wetland via inlet structure #4. AKA 281-F. |
Manage Audience |