Skip to main content

Babb Creek Klondike Mine Treatment System

Babb Creek Klondike Mine Treatment System

Project Details
Original Construction Year 1997
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $80,000.00
Latitude / Longitude Method Unknown
Latitude 41.660000
Longitude -77.174167
Elevation 0
Project Babb Creek Klondike Mine Treatment System
Project Type Passive Treatment System
Project Status
AMD Source Underground
Stream Lick Creek
Watershed
River Basin Susquehanna
Quad Cherry Flats
City/Township Bloss
County Tioga
State PA

Description: The original passive system was constructed in 1997 with an $80,000 EPA. PA DEP designed the system and assisted with construction.The system was upgraded in 2005 with the construction of settling pond with a 10,000 PA DEP Growing Greener Grant. In 2007 the compost in the Vertical Flow Pond was replaced.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Settling Pond 1 N/A
Vertical Flow Pond (VFP) 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization: Babb Creek Watershed Association
Project Designer:
Project Designer Organization: PA DEP
Project Responsible Organization: Babb Creek Watershed Association
Organizations
no data available
External System IDs
Title System
D1-146 Datashed 1.0
PA-91 OSM
Project Performance