Project Details
Original Construction Year 1995
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $204,647.00
Latitude / Longitude Method Unknown
Latitude 41.668056
Longitude -77.143611
Elevation 0
Project Arnot #2 Discharge #4
Project Type Passive Treatment System
Project Status
AMD Source Underground
Stream Lick Creek
Watershed
River Basin Susquehanna
Quad Cherry Flats
City/Township Bloss
County Tioga
State PA

Description: The original passive system was constructed in 1995 for $204,647 and included an Anoxic Limestone Drain and a Vertical Flow Pond. An upgrade was completed in 2005 for $83,400 in which the Vertical Flow Pond was rebuilt due to plugging issues. Tthe number of laterals in the underdrain was increased from 6 to 11, the stone which original was 2B was replaced with AASHTO #3, and the composted was replaced. The ALD also kept plugging so a flushing system was added. . In 2008 the ALD was converted to a limestone ramp for about $25,000.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Inclined Plane Limestone Bed 1 N/A
Vertical Flow Pond (VFP) 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization: Babb Creek Watershed Association
Project Designer: Eric Robertson
Project Designer Organization:
Project Responsible Organization: Babb Creek Watershed Association
External System IDs
Title System
D1-257 Datashed 1.0
PA-230 OSM