Skip navigation
Project Details
  • White Ash # 3 Tunnel B
    No
    Underground
    Passive Treatment System
    Loyalsock
    Lopez
    1999
    $287,817.00
    $278,817.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
BV0116784.434.2------135--029.950.40.330.630.451.060.7961.416.5
BVCTF23.77.867.74----------57.72-50.520.55--0.2--1.06--78.627.2
Treatment Technologies
Treatment Technology Quantity of Elements
Horizontal Flow Limestone Bed (HFLB) 3