Sample Points
Sample Point | Aliases | Photo | ID's | Inflow | Outflow | Years Monitored | Description | Audience | Edit | Delete |
---|---|---|---|---|---|---|---|---|---|---|
F5/6(F6source) | N/A | Yes | No | AMD; Influent to the Filson 5 & 6 Passive System | Manage Audience | |||||
F5/6 New ALD | N/A | No | No | Effluent of the new ALD constructed at the Filson 5 and 6 system. ALD was constructed sometime between 2010 and 2012. | Manage Audience | |||||
F5/6(SAPdis) | N/A | No | No | Effluent of Upflow SAPS; There are 2 effluent pipes. Sometimes sampled as a combined sample and sometimes as individual samples F5/6(SAPdis)R and F5/6(SAPdis)L. | Manage Audience | |||||
F5/6(SAPdis) R | N/A | No | No | Right effluent pipe of the F5/6(SAPdis) upflow SAPS at the Filson 5 and 6 system; sometimes this sample point is collected with the F5/6(SAPdis) L sample point and named F5/6(SAPdis). |
Manage Audience | |||||
F5/6(SAPdis) L | N/A | No | No | Left effluent pipe of the F5/6(SAPdis) upflow SAPS at the Filson 5 and 6 system; sometimes this sample point is collected with the F5/6(SAPdis) R sample point and named F5/6(SAPdis). |
Manage Audience | |||||
F5/6(F5draindis) | N/A | Yes | No | Effluent of Filson 5 ALD | Manage Audience | |||||
F5/6(F6draindis) | N/A | Yes | No | Effluent of Filson 6 ALD | Manage Audience | |||||
F5/6(sysdis) | N/A | No | Yes | Final Effluent of Filson 5 and 6 passive system; Sampled after flows from two finishing ponds confluence | Manage Audience |