Sample Points

Sample Point Inflow Outflow Years Monitored Description Edit Delete
F5/6 New ALD No No

Effluent of the new ALD constructed at the Filson 5 and 6 system. ALD was constructed sometime between 2010 and 2012.

F5/6(F5draindis) Yes No

Effluent of Filson 5 ALD

F5/6(F6draindis) Yes No

Effluent of Filson 6 ALD

F5/6(F6source) Yes No

AMD; Influent to the Filson 5 & 6 Passive System

F5/6(SAPdis) No No

Effluent of Upflow SAPS; There are 2 effluent pipes. Sometimes sampled as a combined sample and sometimes as individual samples F5/6(SAPdis)R and F5/6(SAPdis)L.

F5/6(SAPdis) L No No

Left effluent pipe of the F5/6(SAPdis) upflow SAPS at the Filson 5 and 6 system; sometimes this sample point is collected with the F5/6(SAPdis) R sample point and named F5/6(SAPdis).

F5/6(SAPdis) R No No

Right effluent pipe of the F5/6(SAPdis) upflow SAPS at the Filson 5 and 6 system; sometimes this sample point is collected with the F5/6(SAPdis) L sample point and named F5/6(SAPdis).

F5/6(sysdis) No Yes

Final Effluent of Filson 5 and 6 passive system; Sampled after flows from two finishing ponds confluence