Skip to main content

Sample Points

Sample Point Aliases Photo ID's Inflow Outflow Years Monitored Description Audience Edit Delete
PA34A3 BCU6 N/A 33246 Yes No Abandoned Mine Discharge; This is the primary discharge being treated by the Elbon passive system; The discharge enters an upflow vertical flow pond and is therefore not able to be sampled; Only pre-construction data is available Manage Audience
PA34A1 N/A Yes No Mine discharge coming off hillside and entering the Elbon passive system; The water quality is not bad and is not the primary discharge being treated; May or may not be entering system??? Manage Audience
PA34A2 N/A Yes No Mine discharge coming off hillside and entering the Elbon passive system; The water quality is not bad and is not the primary discharge being treated; May or may not be entering system??? Manage Audience
PA34B N/A No No Effluent of upflow Vertical Flow Pond; The AMD discharge into the system is not accessible for sampling Manage Audience
PA34C N/A No No Effluent of Settling Pond Manage Audience
PA34D N/A No No Effluent of Vertical Flow Wetland Manage Audience
PA34E BCU6B N/A 67208 No Yes Effluent of Settling Basin/Wetland and Final Effluent of Elbon passive System Manage Audience