Project Details
Original Construction Year 2021
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Unknown
Latitude 39.868717
Longitude -79.559837
Elevation
Project Spruell Pipe 3 and Upper Collection System Passive Treatment System
Project Type Passive Treatment System
Project Status
AMD Source
Stream UNT to Glade Run
Watershed
River Basin Monongahela
Quad
City/Township Stewart
County Fayette
State

Description: A 300 ton anoxic limestone drain (ALD) was constructed at the effluent of the UCS. The ALD discharges to an existing vegetated swale which drains to an existing sediment pond. A 700 ton ALD was constructed at the Pipe 3 discharge. The ALD discharges to two existing treatment ponds, in series.

Water Quality Data Summary

Treatment Technologies
no data available
Spruell Pipe 3 and Upper Collection System Passive Treatment System
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization:
Project Designer:
Project Designer Organization: Hedin Environmental
Project Responsible Organization:
Organizations
no data available
External System IDs
no data available
Project Performance