Melcroft Mine Drainage Treatment System

Project Details
Original Construction Year 2010
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $1,111,858.00
Latitude / Longitude Method Unknown
Latitude 40.055797
Longitude -79.394389
Elevation 0
Project Melcroft Mine Drainage Treatment System
Project Type Passive Treatment System
Project Status
AMD Source Underground
Stream Champion Creek
Watershed
River Basin Monongahela
Quad
City/Township Saltlick
County Fayette
State PA

Description: The mine drainage from the Melcroft #3 coal mine and refuse pile enters the system at the collection pond and is then slowly transported to one of the two vertical flow ponds. From there the water goes into the settling pond. After the settlin pong the discharge is furher treated as it passes through two aerobic wetlands before going through its final treatment phase in the managnese removal bed. It is then dishcarged into Champion Creek. MWA estimates $23,000 annual cost to monitor and maintain.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Aerobic Wetland 2 N/A
Forebay 1 N/A
Manganese Removal Bed 1 N/A
Settling Pond 1 N/A
Vertical Flow Pond (VFP) 2 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person: carla
Contact Organization: Mountain Watershed Association
Project Designer:
Project Designer Organization:
Project Responsible Organization: Mountain Watershed Association
External System IDs
Title System
D1-497 Datashed 1.0
Project Performance