Project Details
Original Construction Year 2004
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $402,800.00
Latitude / Longitude Method Unknown
Latitude 40.367222
Longitude -80.360556
Elevation 1100
Project JB2
Project Type Passive Treatment System
Project Status
AMD Source Surface, Underground
Stream Raccoon Creek
Watershed
River Basin Ohio
Quad Midway
City/Township Smith Twp
County Washington
State PA

Description: A passive system consisting of a vertical flow wetland and settling pond was installed in 2004 ($372,800) to treat the JB2 abandoned mine discharge. In 2006, $112,575 from WPCAMRs Quick Response Program was received. At that time, the mushroom compost was removed along with iron sludge to convert to a limestone bed and created a forebay area. Additional work at this time included adding limestone and installing an emergency spillway. In 2009 the bed was converted to a FeAlMn Bed for $100,000. A trust fund has been established with Penn's Corner Conservancy

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Settling Pond 1 N/A
Vertical Flow Pond (VFP) 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization:
Project Designer: Dan Sammarco
Project Designer Organization:
Project Responsible Organization:
External System IDs
Title System
D1-62 Datashed 1.0
PA-8 OSM
Project Performance