Dimeling Discharge AMD Remediation

Dimeling Discharge AMD Remediation

Project Details
Original Construction Year 2013
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $47,465.00
Latitude / Longitude Method Unknown
Latitude 40.971530
Longitude -78.398932
Elevation
Project Dimeling Discharge AMD Remediation
Project Type Passive Treatment System
Project Status Good/Operational
AMD Source Underground
Stream UNT to Clearfield Creek
Watershed
River Basin Susquehanna
Quad
City/Township Boggs
County Clearfield
State PA

Description: The purpose of this project was to design and construct a passive treatment system to abate the iron and acidity loadings to the impacted UNT to Clearfield Creek. The pH of this discharge ranged from 5.7 to 6.5. Acidity ranged from 18 to 94 mg/L, and alkalinity ranged from 20 to 54 mg/L. The specific conductance ranged from 810 to 1470 umhos/cm. Aluminum ranged from 0.06 to 0.33 mg/L. Iron ranged from 12.9 to 54.5 mg/L, manganese ranged from 12.5 to 30.8 mg/L, and sulfates ranged from 397 to 904 mg/L. The average total discharge was 60 gpm and the average metal load was 252,000 g/day. This project was for the design and permitting of the passive treatment system to treat the Dimeling Discharge. The design consists of an equalization basin, sulfate reducing bioreactor, and settling basin as well as a relocated channel to route upslope runoff around the treatment system.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Forebay 1 N/A
Settling Pond 1 N/A
Sulfate Reducing Bio-Reactor 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person: kwilliamsccd
Contact Organization: Clearfield County Conservation District
Project Designer: WHM Group and New Miles of Blue Stream
Project Designer Organization:
Project Responsible Organization: PA DEP
Organizations
no data available
External System IDs
Title System
PA-313 OSM
Project Performance