Skip to main content

Bear Run Phase V

Bear Run Phase V

Project Details
Original Construction Year
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Unknown
Latitude 40.871975
Longitude -78.819524
Elevation
Project Bear Run Phase V
Project Type Active Treatment System
Project Status
AMD Source Underground
Stream South Branch Bear Run
Watershed
River Basin Susquehanna
Quad
City/Township Banks
County Indiana
State PA

Description: At the Bear Run Phase V, a Swedish-Bucket Lime Silo was installed to treat a discharge exiting the Bank #2 Drift Mine. To decrease the cost, an older lime silo was purchased from Consol Energy and retrofitted with the Swedish-Bucket dumping system.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Chemical Doser 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization:
Project Designer:
Project Designer Organization:
Project Responsible Organization:
Funding
no data available
Organizations
no data available
External System IDs
Title System
PA-310 OSM
Project Performance