RLB2 Passive Treatment System

Project Details
Original Construction Year 2023
Most Recent Rebuild Year 2023
Total Cost 0.00
Total Capital Cost $245,900.00
Latitude / Longitude Method Google Earth/Maps
Latitude 40.845165
Longitude -78.313128
Elevation
Project RLB2 Passive Treatment System
Project Type Passive Treatment System
Project Status Good/Operational
AMD Source Surface
Stream Little Beaver Run
Watershed
River Basin Susquehanna
Quad
City/Township Decatur
County Clearfield
State PA

Description: The system passively treats acid mine drainage (AMD) from a surface coal mine using limestone aggregate and a settling pond. The system consists of an AMD collection system, one limestone bed (LSB) and a settling pond. A general flow schematic follows. The LSB is manually drained empty on an as-needed basis to flush out accumulated metals solids. The draining water also flows to the settling pond. Both the LSB and settling pond have PVC liners covered with 6-12” of clay soil.

Water Quality Data Summary

Treatment Technologies
no data available
Location Links
Map
GPS Directions
Project Contacts
Contact Person: kwilliamsccd
Contact Organization: Clearfield County Conservation District
Project Designer:
Project Designer Organization: Hedin Environmental
Project Responsible Organization: Clearfield County Conservation District
Funding
no data available
Organizations
no data available
External System IDs
no data available
Project Performance