Skip to main content

Cherry Run Passive Treatment Systems

Cherry Run Passive Treatment Systems

Project Details
Original Construction Year 2019
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Google Earth/Maps
Latitude 41.264730
Longitude -78.520210
Elevation
Project Cherry Run Passive Treatment Systems
Project Type Passive Treatment System
Project Status
AMD Source Underground
Stream Cherry Run
Watershed
River Basin Susquehanna
Quad
City/Township Jay / Jay
County Elk
State PA

Description: The systems treat flow from abandoned entries into underground coal mines that are referred to as K1 and K2. The K1 system consists of two parallel drainable limestone beds that discharge primary flow to Cardiff Run but periodically flush to a settling pond that discharges to Cardiff Run near its confluence with Cherry Run. The K2 system consists of one drainable limestone bed that discharges and flushes to a settling pond and wetland in series that ultimately discharges to Cardiff Run.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Flush Pond 2 N/A
Limestone Bed 3 N/A
Cherry Run Passive Treatment Systems
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization:
Project Designer:
Project Designer Organization: Hedin Environmental
Project Responsible Organization:
Organizations
no data available
External System IDs
no data available
Project Performance