Jamison Mine (Novasel RAMP) (Wolford Run ) Borehole nodes
Primary tabs
Title | Content type | Status | Updated Sort ascending | Operations |
---|---|---|---|---|
Airshaft | Sample Point | Published | ||
Pond 3 | Sample Point | Published | ||
Borehole | Sample Point | Published | ||
Pond In | Sample Point | Published | ||
Anoxic Limestone Drain (ALD) | Treatment Technologies | Published | ||
Settling Pond | Treatment Technologies | Published | ||
Jamison Mine (Novasel RAMP) (Wolford Run ) Borehole / Analysis Report, Import 170 | Analysis Report | Published | ||
Jamison Site Schematic | Downloads | Published | ||
Kiski-Conemaugh OMR Assessment 12-8-17 | Downloads | Published | ||
Jamison Mine Map | Downloads | Published | ||
Jamison Borehole Location Study | Downloads | Published | ||
Wolford Treatment Project Phase II Final Report 2015 | Downloads | Published | ||
Jamison System Design 1 of 6 | Downloads | Published | ||
Wolford Run Investigation and Reconstruction Design FR 2006 | Downloads | Published | ||
Kiskiminetas River | Watershed | Published | ||
PA-69 | System ID | Published | ||
PA DEP Growing Greener | Funding | Published | ||
Rural Abandoned Mineland Program (RAMP) | Funding | Published |