Laurel Run #1

Laurel Run #1

Project Details
Original Construction Year 2001
Most Recent Rebuild Year 2025
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Unknown
Latitude 40.508236
Longitude -79.112892
Elevation 0
Project Laurel Run #1
Project Type Passive Treatment System
Project Status Good/Operational
AMD Source Underground
Stream Laurel Run
Watershed
River Basin Kiski-Conemaugh
Quad Brush Valley
City/Township Center Township
County Indiana
State PA

Description: The Laurel Run # 1 passive treatment system was originally constructed by Stream Restoration Incorporated and the Blacklick Creek Watershed Association in 2001 to treat an abandoned mine discharge in the headwaters of Laurel Run which is a tributary to Blacklick Creek. The original passive system was designed by BioMost, Inc and constructed by Amerikohl Mining. The system was redesigned by BioMost in 2024. Construction was completed by Joe Puryear in early 2025.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Aerobic Wetland 1 N/A
Settling Pond 1 N/A
Vertical Flow Pond (VFP) 2 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization: Stream Restoration Inc.
Project Designer: Donnovan Clayton
Project Designer Organization: BioMost, Inc
Project Responsible Organization: Stream Restoration Inc.
External System IDs
Title System
D1-225 Datashed 1.0
PA-191 OSM
Project Performance