Project Details
  • Bellwood (lloydville Run) Site C
    No
    Underground
    Passive Treatment System
    Bells Gap Run
    Blandburg
    2001
    $20,000.00
    $0.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
BLR43.46.125.95----------23.3389.267.12--3.29--0.2--239.218
CRAW/ALD55.935.52--10.28.8----22.6967.5452.7--2.78--0.18--197.123.1
CSEDOUT3.86.486.38--4.310.2----56.99-36.2310.12--2.02--0.18--189.617.2
Treatment Technologies
Treatment Technology Quantity of Elements
Anoxic Limestone Drain (ALD) 1
Settling Pond 1