  • Babb Creek Klondike Mine Treatment System
    No
    Underground
    Passive Treatment System
    Babb Creek
    Cherry Flats

    The original passive system was constructed in 1997 with an $80,000 EPA. PA DEP designed the system and assisted with construction.The system was upgraded in 2005 with the construction of settling pond with a 10,000 PA DEP Growing Greener Grant. In 2007 the compost in the Vertical Flow Pond was replaced.

    1997
    $115,000.00
    $80,000.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
91-11186.53.243.22.5--6579--098.763.733.392.27--7.98--162.338.4
91-11.1152.36.516.396.3--7.8514--67.8-12.982.654.751.66--2.44--165.326.5
Treatment Technologies
Treatment Technology Quantity of Elements
Settling Pond 1