Skip to main content

SB1

Final Effluent of the McIntire passive treatment system; Existing Sediment Basin constructed during mining and built within the unnamed reconstructed "McIntire" tributary #15 to Blacks Creek; Receives flow from both the Horizontal Flow Bed 2 (HFLB2) as well as from the reconstructed stream channel sampled at RS2; This data represents all sampling conducted after the passive treatment system was constructed; Effluent represents the beginning of trib #15; Located upstream of BC4.1; Type:
Quad:
Lat: 41.165313
Long: -79.912534
Inflow: No
Outflow: Yes
Flow Order: 11
ID's:
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete