D7
Pre-construction: AMD about 300’ upgradient of McIntyre Road and NLO-D3. Original discharge location of D2. As refuse was removed from the project area, the discharge was discovered to emanate at the D2 location.
Post-construction: OPC1 upstream of confluence with OPC2 effluent
Type:Quad:
Lat: 40.566488
Long: -79.294931
Inflow: No
Outflow: No
Flow Order: 7
ID's: 99424
Aliases:
Return to Project Sample Points | Manage Audience | Edit | Delete