Ross A2
AMD; This is the primary source of mine drainage entering the system, but currently can't be sampled as the discharge enters the VFP below water level; Reportedly this source was created when the contractor accidentally broke into the mine workings during construction. A perforated collection pipe may have been installed Type: AMDQuad:
Lat: 40.914626
Long: -78.348192
Inflow: Yes
Outflow: No
Flow Order: 1
ID's:
Aliases:
Return to Project Sample Points | Manage Audience | Edit | Delete