Ross A2

AMD; This is the primary source of mine drainage entering the system, but currently can't be sampled as the discharge enters the VFP below water level; Reportedly this source was created when the contractor accidentally broke into the mine workings during construction. A perforated collection pipe may have been installed

Type: AMD
Quad:
Lat:
Long:
Inflow: On
Outflow: Off
Flow Order: 1

Return to Project Sample Points | Edit | Delete