Skip to main content

Mr Tuff Morgan Run

Mr Tuff Morgan Run

Project Details
Original Construction Year 2008
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $0.00
Latitude / Longitude Method Unknown
Latitude 40.881389
Longitude -78.354722
Elevation 0
Project Mr Tuff Morgan Run
Project Type Passive Treatment System
Project Status
AMD Source
Stream Morgan Run
Watershed
River Basin Susquehanna
Quad Wallaceton
City/Township Decatur
County Clearfield
State PA

Description: The Morgan Run Tuff (MR Tuff) passive system was originally constructed in 2008. In 2017, the system was redesigned and rehabilitated. Therefore data prior to 2017 is representative of the original system. Some of the sample point locations now may represent different stages of treatment than in the past. The revised system consists of two stream intakes that capture and convey the water to one of three treatment trains. The original vertical flow ponds were converted to solar-powered drainable limestone beds.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Aerobic Wetland 1 N/A
Anaerobic Wetland 1 N/A
Up Flow SAPS 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person: kwilliamsccd
Contact Organization: Clearfield County Conservation District
Project Designer: Jen Demchak
Project Designer Organization:
Project Responsible Organization: Clearfield County Conservation District
Funding
Organizations
no data available
External System IDs
Title System
D1-421 Datashed 1.0
PA-258 OSM
Project Performance