Skip to main content

3893 OPB

Effluent of the Settling Pond (aka OPB ) and Final effluent of the treatment system; located below cage on pond bank;  Sometimes this pond was sampled in the emergency spillway on the southern side of the pond and sometimes this was sampled at the effluent pipe

Type:
Quad: Dents Run
Lat: 41.34882226143243
Long: -78.35847886942281
Inflow: No
Outflow: Yes
Flow Order: 5
ID's:
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete