Skip to main content

SB1A (pre-treatment)

Old sampling point prior to construction of the passive treatment system; Sampled in emergency spillway as effluent pipe of Settling Basin 1 (SB1) became plugged; located downstream of RS2; about 1500 feet Upstream of BC4.1 Type:
Quad:
Lat:
Long:
Inflow: No
Outflow: No
Flow Order:
ID's:
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete