Skip to main content

SB1 (pre-treatment)

Sample point of SB1 prior to installation of the passive treatment system. Existing Sediment Basin constructed during mining and built within the unnamed reconstructed "McIntire" tributary #15 to Blacks Creek; Received flow from the reconstructed stream channel (RS2); Sampled at pipe and spillway; Effluent represents the beginning of trib #15; Located upstream of BC4.1; Type:
Quad:
Lat:
Long:
Inflow: No
Outflow: No
Flow Order:
ID's:
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete