Skip to main content

D7

Pre-construction: AMD about 300’ upgradient of McIntyre Road and NLO-D3. Original discharge location of D2. As refuse was removed from the project area, the discharge was discovered to emanate at the D2 location.

Post-construction: OPC1 upstream of confluence with OPC2 effluent

Type:
Quad:
Lat: 40.566488
Long: -79.294931
Inflow: No
Outflow: No
Flow Order: 7
ID's: 99424
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete