Description
Effluent of Settling Pond #2 from the the A1 treatment train which flows into Limestone Pond #2 on hand-drawn schematic or Limestone Pond 4 on OM&R Plan Schematic
Type
Passive System
Flow Order
3
Location by GPS
No
State / Province
PA
Latitude
40.154513
Longitude
-78.184734
Inflow
Off
Outflow
Off